{"id":17188,"date":"2022-12-30T10:19:19","date_gmt":"2022-12-30T09:19:19","guid":{"rendered":"https:\/\/biblus.accasoftware.com\/fr\/?p=17188"},"modified":"2024-01-10T12:19:20","modified_gmt":"2024-01-10T11:19:20","slug":"gestion-des-couts-de-construction","status":"publish","type":"post","link":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/","title":{"rendered":"Gestion des co\u00fbts de construction"},"content":{"rendered":"<p class=\"sommario\">La gestion des co\u00fbts de construction aide \u00e0 respecter les d\u00e9lais et le budget pr\u00e9vus. Voyons comment proc\u00e9der et quels avantages cela apporte<\/p>\n<p><!--more--><\/p>\n<p>La gestion des co\u00fbts de construction est le processus par lequel les professionnels responsables de ce domaine contr\u00f4lent les d\u00e9penses en g\u00e9rant les co\u00fbts de la main-d&rsquo; \u0153uvre, des mat\u00e9riaux et des frais g\u00e9n\u00e9raux pour garantir que le projet est achev\u00e9 dans le respect du budget.<\/p>\n<p>Le contr\u00f4le des co\u00fbts repose sur des estimations fiables et un suivi constant tout au long du projet.<\/p>\n<p>Comment faire pour g\u00e9rer au mieux cet aspect si important&nbsp;?&nbsp;Un <a href=\"https:\/\/www.accasoftware.com\/fr\/logiciel-bim-5d\" target=\"_blank\" rel=\"noopener\">logiciel BIM 5D<\/a> est une aide n\u00e9cessaire.<\/p>\n<h2 id=\"quest-ce-que-la-gestion-des-couts-de-construction\">Qu&rsquo;est-ce que la gestion des co\u00fbts de construction\u00a0?<\/h2>\n<p>G\u00e9rer les co\u00fbts de construction signifie poursuivre l&rsquo;objectif de <strong>maintenir toutes les activit\u00e9s li\u00e9es \u00e0 un travail dans le budget pr\u00e9vu<\/strong>, en prot\u00e9geant les concepteurs, les entrepreneurs et les ma\u00eetres d&rsquo;ouvrage.<\/p>\n<p>En d&rsquo;autres termes, une gestion efficace des co\u00fbts fixe une limite maximale pour tous les co\u00fbts du projet et garantit que les d\u00e9penses, pour toute la dur\u00e9e des travaux, restent conformes aux pr\u00e9visions.<\/p>\n<p>La gestion des co\u00fbts affecte toutes les \u00e9tapes d&rsquo;un projet, y compris la planification, la conception, l&rsquo;estimation, la phase de construction de l&rsquo;ouvrage, les ordres de modification et, bien s\u00fbr, le produit fini.<\/p>\n<p>Enfin, il est indispensable de respecter le budget du projet pour\u00a0d\u00e9montrer que toute l&rsquo;\u00e9quipe de travail a \u00e9t\u00e9 proactive, efficace et pr\u00e9cise tant dans l&rsquo;estimation que dans la bonne ex\u00e9cution des travaux.<\/p>\n<p>Souhaitez-vous un <a href=\"https:\/\/www.accasoftware.com\/fr\/metre-et-devis-en-ligne\">logiciel de m\u00e9tr\u00e9 en ligne<\/a>&nbsp;?&nbsp;<strong>Commencez gratuitement<\/strong><\/p>\n<h2 id=\"quelle-est-limportance-du-controle-des-couts-dans-le-batiment\">Quelle est l&rsquo;importance du contr\u00f4le des co\u00fbts dans le b\u00e2timent ?<\/h2>\n<p>Le contr\u00f4le des co\u00fbts de construction est un aspect tr\u00e8s important dans le processus de construction d&rsquo;un ouvrage, car il garantit au client que les travaux sont r\u00e9alis\u00e9s conform\u00e9ment aux plans et au budget mis en place lors de la phase de planification des travaux.<\/p>\n<p>Le but d&rsquo;un plan de contr\u00f4le des co\u00fbts est de s&rsquo;assurer que le projet est livr\u00e9 \u00e0 temps et dans le respect du budget.<\/p>\n<p>Pour ce faire, il faut suivre un processus de gestion des co\u00fbts, qui comprend les \u00e9tapes suivantes&nbsp;:&nbsp;<\/p>\n<ul>\n<li>planification des ressources\u00a0;<\/li>\n<li>devis et m\u00e9tr\u00e9\u00a0;<\/li>\n<li>estimation globale des d\u00e9penses ;<\/li>\n<li>contr\u00f4le et suivi des d\u00e9penses.<\/li>\n<\/ul>\n<div id=\"attachment_17193\" style=\"width: 809px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" aria-describedby=\"caption-attachment-17193\" class=\"size-full wp-image-17193\" src=\"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2022\/12\/controle-couts-de-construction-.png\" alt=\"contr\u00f4le des co\u00fbts de construction\" width=\"799\" height=\"583\" srcset=\"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2022\/12\/controle-couts-de-construction-.png 799w, https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2022\/12\/controle-couts-de-construction--300x219.png 300w, https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2022\/12\/controle-couts-de-construction--768x560.png 768w, https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2022\/12\/controle-couts-de-construction--705x514.png 705w, https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2022\/12\/controle-couts-de-construction--219x160.png 219w\" sizes=\"(max-width: 799px) 100vw, 799px\" \/><p id=\"caption-attachment-17193\" class=\"wp-caption-text\"><em>Contr\u00f4le des co\u00fbts de construction<\/em><\/p><\/div>\n<h2 id=\"quelles-sont-les-methodes-pour-le-controle-des-couts-de-construction\">Quelles sont les m\u00e9thodes pour le contr\u00f4le des co\u00fbts de construction ?<\/h2>\n<p>Afin de contr\u00f4ler pleinement les co\u00fbts de construction et d&rsquo;\u00e9viter les d\u00e9sagr\u00e9ments inattendus pendant et \u00e0 la fin des travaux, il convient de suivre quelques \u00e9tapes fondamentales. Voici quelques conseils \u00e0 suivre pour am\u00e9liorer le contr\u00f4le et la gestion des co\u00fbts de construction.<\/p>\n<h3>Faire des estimations pr\u00e9cises<\/h3>\n<p>Toutes les techniques de contr\u00f4le des co\u00fbts seraient vou\u00e9es \u00e0 l&rsquo;\u00e9chec sans<strong> une<\/strong> <strong>planification ad\u00e9quate du projet<\/strong>.<\/p>\n<p>Pour faire des estimations pr\u00e9cises, il faut examiner les co\u00fbts de la main-d&rsquo;\u0153uvre, le co\u00fbt des mat\u00e9riaux, des \u00e9quipements, \u00e9valuer soigneusement les quantit\u00e9s pr\u00e9vues dans le projet mais aussi les r\u00e9mun\u00e9rations professionnelles et les co\u00fbts li\u00e9s aux d\u00e9penses, aux permis, etc. Plus ces \u00e9valuations seront pr\u00e9cises, plus la probabilit\u00e9 d&rsquo;avoir des estimations pr\u00e9cises sera \u00e9lev\u00e9e.<\/p>\n<p>Pour ce faire, il est indispensable d&rsquo;utiliser un <a href=\"https:\/\/www.accasoftware.com\/fr\/logiciel-bim-5d\" target=\"_blank\" rel=\"noopener\">logiciel BIM 5D<\/a>, avec lequel faire le devis et m\u00e9tr\u00e9 des travaux automatiquement \u00e0 partir du mod\u00e8le BIM au format IFC. Cela vous permet de minimiser les erreurs d&rsquo;\u00e9valuation car les quantit\u00e9s \u00e0 calculer sont calcul\u00e9es automatiquement par le logiciel, directement \u00e0 partir du mod\u00e8le 3D du projet.<\/p>\n<p>Actuellement, il existe \u00e9galement des outils de <a href=\"https:\/\/www.accasoftware.com\/fr\/metre-et-devis-en-ligne\" target=\"_blank\" rel=\"noopener\">devis et m\u00e9tr\u00e9 en ligne<\/a> utiles pour faire des estimations, des devis et des listes de prix de mani\u00e8re collaborative sur Internet, o\u00f9 que vous soyez et \u00e0 partir de n&rsquo;importe quel dispositif.<\/p>\n<p>En outre, il peut \u00e9galement \u00eatre utile d&rsquo;examiner les d\u00e9penses globales des projets pr\u00e9c\u00e9dents et de r\u00e9aliser des analyses de march\u00e9 sur des travaux du m\u00eame type et dans des zones g\u00e9ographiques comparables \u00e0 celle d&rsquo;intervention.<\/p>\n<p>Il est toujours pr\u00e9f\u00e9rable d&rsquo;\u00e9viter des estimations trop optimistes\u00a0: il est beaucoup mieux d&rsquo;avoir des \u00e9conomies inattendues que d&rsquo;avoir \u00e0 faire face \u00e0 un d\u00e9passement de budget.<\/p>\n<h3>Communiquer avec l&rsquo;\u00e9quipe<\/h3>\n<p>La communication entre tous les membres de l&rsquo;\u00e9quipe est essentielle pour respecter le budget. Un <strong>processus de travail \u00e9clair\u00e9<\/strong>, dans lequel tout le monde sait quoi faire et conna\u00eet les d\u00e9lais \u00e0 respecter et les ressources \u00e0 disposition, aide \u00e0 \u00e9viter de d\u00e9passer le budget.<\/p>\n<p>En outre, une ligne de communication continue aide \u00e0 faire face aux crises ou aux changements de programme d\u00e8s qu&rsquo;ils surviennent. Pour ce faire, il convient d&rsquo;utiliser un <a href=\"https:\/\/www.accasoftware.com\/fr\/bim-management-system\" target=\"_blank\" rel=\"noopener\">BIM management system<\/a> pour g\u00e9rer au mieux la communication, la collaboration et la coordination de l&rsquo;\u00e9quipe de travail dans le processus de construction.<\/p>\n<h3>Faire des rapports p\u00e9riodiques<\/h3>\n<p>R\u00e9diger des rapports quotidiens sur ce qui se passe sur le chantier et mettre \u00e0 jour p\u00e9riodiquement les programmes de travail, vous permet d&rsquo;identifier les co\u00fbts qui ne correspondent pas aux estimations ou les interruptions\/variations potentielles dans le programme de construction, ce qui vous donne la possibilit\u00e9 d&rsquo;intervenir rapidement dans la r\u00e9solution du probl\u00e8me.<\/p>\n<p>Gr\u00e2ce au contr\u00f4le constant, vous r\u00e9duisez les risques d&rsquo;impr\u00e9vus et vous pouvez g\u00e9rer les probl\u00e8mes et les interf\u00e9rences s&rsquo;ils surviennent.<\/p>\n<p>Pour vous assurer que vos projets de construction se d\u00e9roulent sans inconv\u00e9nients et dans les d\u00e9lais et les co\u00fbts pr\u00e9vus, nous vous recommandons d&rsquo;utiliser un <a href=\"https:\/\/www.accasoftware.com\/fr\/construction-management-software\" target=\"_blank\" rel=\"noopener\">logiciel de gestion de la construction<\/a>, \u00e0 utiliser enti\u00e8rement en ligne et \u00e0 partir de n&rsquo;importe quel dispositif (smartphone, tablette, PC).<\/p>\n<h3>Avoir des plans de secours<\/h3>\n<p>S&rsquo;il se passe quelque chose qui met en p\u00e9ril le budget estim\u00e9 du projet, il est toujours judicieux d&rsquo;avoir un plan de secours.<\/p>\n<p>Au cours de la phase de planification, il est d\u00e9j\u00e0 bon d&rsquo;identifier les risques potentiels et d&rsquo;\u00e9laborer un plan qui indique exactement ce qu&rsquo;il faut faire pour \u00e9viter une nouvelle augmentation des co\u00fbts. Dans tous les cas, il est toujours pr\u00e9f\u00e9rable de limiter au minimum les modifications.<\/p>\n<h3>Effectuer des \u00e9valuations post-op\u00e9rationnelles<\/h3>\n<p>Ind\u00e9pendamment du fait que vous avez respect\u00e9 le budget, une fois le projet termin\u00e9, il est souhaitable d&rsquo;effectuer une \u00e9valuation post-op\u00e9rationnelle de v\u00e9rification.<\/p>\n<p>Une r\u00e9union avec les principales parties prenantes et l&rsquo;analyse des \u00e9v\u00e9nements qui se sont produits pendant les travaux (en \u00e9valuant \u00e0 la fois ce qui s&rsquo;est bien et ce qui ne s&rsquo;est pas bien pass\u00e9) permettent de mieux se pr\u00e9parer aux projets futurs.<\/p>\n<h3>Utiliser un logiciel de gestion de la construction<\/h3>\n<p>Actuellement, g\u00e9rer un processus de construction et ses co\u00fbts implique l&rsquo;<strong>utilisation de logiciels sp\u00e9cifiques<\/strong>.<\/p>\n<p>Avec une <a href=\"https:\/\/www.accasoftware.com\/fr\/bim-management-system\" target=\"_blank\" rel=\"noopener\">plateforme de BIM management<\/a>, vous pouvez faire des estimations de co\u00fbts, g\u00e9rer quotidiennement la coordination et la collaboration de toute l&rsquo;\u00e9quipe de travail, g\u00e9rer des mod\u00e8les BIM 3D, organiser le travail au bureau et sur le chantier, etc.<\/p>\n<p>Il est ainsi plus facile de g\u00e9rer des projets de grande envergure et des \u00e9quipes de travail multidisciplinaires sans jamais perdre le contr\u00f4le de chaque phase et activit\u00e9 en cours.<\/p>\n<p>&nbsp;<\/p>\n<div class=\"international-product-banner-desktop\" style=\"text-align: center;\"><a class=\"product-banner-link\" href=https:\/\/www.accasoftware.com\/fr\/logiciel-bim-5d target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" src=\"\/wp-content\/themes\/enfold-child\/img\/banner_prodotto\/primus-ifc-fr.jpg\" alt=\"primus-ifc\" \/><\/a><\/div>\n<div class=\"international-product-banner-mobile\" style=\"text-align: center;\"><a class=\"product-banner-link\" href=https:\/\/www.accasoftware.com\/fr\/logiciel-bim-5d target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" src=\"\/wp-content\/themes\/enfold-child\/img\/banner_prodotto_mobile\/primus-ifc-fr.jpg\" alt=\"primus-ifc\" \/><\/a><\/div>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>La gestion des co\u00fbts de construction aide \u00e0 respecter les d\u00e9lais et le budget pr\u00e9vus. Voyons comment proc\u00e9der et quels avantages cela apporte<\/p>\n","protected":false},"author":27,"featured_media":17194,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"keyword_en":"","keyword_es":"","keyword_fr":"","keyword_de":"","keyword_ptb":"","_note_content":"","footnotes":""},"categories":[4752],"tags":[4765,4755],"class_list":["post-17188","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bim-facility-management","tag-acca-resolver","tag-newsletter-270"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.8 (Yoast SEO v27.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Gestion des co\u00fbts de construction - BibLus<\/title>\n<meta name=\"description\" content=\"Gestion des co\u00fbts de construction aide \u00e0 respecter les d\u00e9lais et le budget pr\u00e9vu au d\u00e9part. Voyons comment faire et quels sont les avantages\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gestion des co\u00fbts de construction\" \/>\n<meta property=\"og:description\" content=\"Gestion des co\u00fbts de construction aide \u00e0 respecter les d\u00e9lais et le budget pr\u00e9vu au d\u00e9part. Voyons comment faire et quels sont les avantages\" \/>\n<meta property=\"og:url\" content=\"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"BibLus\" \/>\n<meta property=\"article:published_time\" content=\"2022-12-30T09:19:19+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-01-10T11:19:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2022\/12\/Gestion-couts-construction.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"843\" \/>\n\t<meta property=\"og:image:height\" content=\"321\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"ivanogagliardo\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"ivanogagliardo\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/gestion-des-couts-de-construction\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/gestion-des-couts-de-construction\\\/\"},\"author\":{\"name\":\"ivanogagliardo\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/#\\\/schema\\\/person\\\/f503933d5fcf4c0e352a67cb08682da1\"},\"headline\":\"Gestion des co\u00fbts de construction\",\"datePublished\":\"2022-12-30T09:19:19+00:00\",\"dateModified\":\"2024-01-10T11:19:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/gestion-des-couts-de-construction\\\/\"},\"wordCount\":1302,\"image\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/gestion-des-couts-de-construction\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/12\\\/Gestion-couts-construction.jpg\",\"keywords\":[\"acca-resolver\",\"Newsletter 270\"],\"articleSection\":[\"BIM et Facility Management\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/gestion-des-couts-de-construction\\\/\",\"url\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/gestion-des-couts-de-construction\\\/\",\"name\":\"Gestion des co\u00fbts de construction - BibLus\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/gestion-des-couts-de-construction\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/gestion-des-couts-de-construction\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/12\\\/Gestion-couts-construction.jpg\",\"datePublished\":\"2022-12-30T09:19:19+00:00\",\"dateModified\":\"2024-01-10T11:19:20+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/#\\\/schema\\\/person\\\/f503933d5fcf4c0e352a67cb08682da1\"},\"description\":\"Gestion des co\u00fbts de construction aide \u00e0 respecter les d\u00e9lais et le budget pr\u00e9vu au d\u00e9part. Voyons comment faire et quels sont les avantages\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/gestion-des-couts-de-construction\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/gestion-des-couts-de-construction\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/gestion-des-couts-de-construction\\\/#primaryimage\",\"url\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/12\\\/Gestion-couts-construction.jpg\",\"contentUrl\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2022\\\/12\\\/Gestion-couts-construction.jpg\",\"width\":843,\"height\":321,\"caption\":\"Gestion des co\u00fbts de construction\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/gestion-des-couts-de-construction\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gestion des co\u00fbts de construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/\",\"name\":\"BibLus\",\"description\":\"Blog du savoir faire et du logiciel pour l&#039;architecture, l&#039;ing\u00e9nierie et la construction\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/#\\\/schema\\\/person\\\/f503933d5fcf4c0e352a67cb08682da1\",\"name\":\"ivanogagliardo\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Gestion des co\u00fbts de construction - BibLus","description":"Gestion des co\u00fbts de construction aide \u00e0 respecter les d\u00e9lais et le budget pr\u00e9vu au d\u00e9part. Voyons comment faire et quels sont les avantages","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/","og_locale":"fr_FR","og_type":"article","og_title":"Gestion des co\u00fbts de construction","og_description":"Gestion des co\u00fbts de construction aide \u00e0 respecter les d\u00e9lais et le budget pr\u00e9vu au d\u00e9part. Voyons comment faire et quels sont les avantages","og_url":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/","og_site_name":"BibLus","article_published_time":"2022-12-30T09:19:19+00:00","article_modified_time":"2024-01-10T11:19:20+00:00","og_image":[{"width":843,"height":321,"url":"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2022\/12\/Gestion-couts-construction.jpg","type":"image\/jpeg"}],"author":"ivanogagliardo","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"ivanogagliardo","Dur\u00e9e de lecture estim\u00e9e":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/#article","isPartOf":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/"},"author":{"name":"ivanogagliardo","@id":"https:\/\/biblus.accasoftware.com\/fr\/#\/schema\/person\/f503933d5fcf4c0e352a67cb08682da1"},"headline":"Gestion des co\u00fbts de construction","datePublished":"2022-12-30T09:19:19+00:00","dateModified":"2024-01-10T11:19:20+00:00","mainEntityOfPage":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/"},"wordCount":1302,"image":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2022\/12\/Gestion-couts-construction.jpg","keywords":["acca-resolver","Newsletter 270"],"articleSection":["BIM et Facility Management"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/","url":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/","name":"Gestion des co\u00fbts de construction - BibLus","isPartOf":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/#primaryimage"},"image":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2022\/12\/Gestion-couts-construction.jpg","datePublished":"2022-12-30T09:19:19+00:00","dateModified":"2024-01-10T11:19:20+00:00","author":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/#\/schema\/person\/f503933d5fcf4c0e352a67cb08682da1"},"description":"Gestion des co\u00fbts de construction aide \u00e0 respecter les d\u00e9lais et le budget pr\u00e9vu au d\u00e9part. Voyons comment faire et quels sont les avantages","breadcrumb":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/#primaryimage","url":"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2022\/12\/Gestion-couts-construction.jpg","contentUrl":"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2022\/12\/Gestion-couts-construction.jpg","width":843,"height":321,"caption":"Gestion des co\u00fbts de construction"},{"@type":"BreadcrumbList","@id":"https:\/\/biblus.accasoftware.com\/fr\/gestion-des-couts-de-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/biblus.accasoftware.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Gestion des co\u00fbts de construction"}]},{"@type":"WebSite","@id":"https:\/\/biblus.accasoftware.com\/fr\/#website","url":"https:\/\/biblus.accasoftware.com\/fr\/","name":"BibLus","description":"Blog du savoir faire et du logiciel pour l&#039;architecture, l&#039;ing\u00e9nierie et la construction","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/biblus.accasoftware.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Person","@id":"https:\/\/biblus.accasoftware.com\/fr\/#\/schema\/person\/f503933d5fcf4c0e352a67cb08682da1","name":"ivanogagliardo"}]}},"_links":{"self":[{"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/posts\/17188","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/users\/27"}],"replies":[{"embeddable":true,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/comments?post=17188"}],"version-history":[{"count":5,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/posts\/17188\/revisions"}],"predecessor-version":[{"id":22561,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/posts\/17188\/revisions\/22561"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/media\/17194"}],"wp:attachment":[{"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/media?parent=17188"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/categories?post=17188"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/tags?post=17188"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}