{"id":24667,"date":"2024-05-17T09:34:25","date_gmt":"2024-05-17T07:34:25","guid":{"rendered":"https:\/\/biblus.accasoftware.com\/fr\/?p=24667"},"modified":"2024-05-17T11:35:32","modified_gmt":"2024-05-17T09:35:32","slug":"ouvrages-temporaires-dans-le-domaine-de-la-construction","status":"publish","type":"post","link":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/","title":{"rendered":"Ouvrages temporaires dans le domaine de la construction"},"content":{"rendered":"<p class=\"sommario\">Toutes les structures et les travaux temporaires ind\u00e9pendants du b\u00e2timent et ne faisant pas partie de l&rsquo;ouvrage termin\u00e9 sont consid\u00e9r\u00e9s comme des ouvrages temporaires<\/p>\n<p><!--more--><\/p>\n<p>Les ouvrages temporaires sont toutes les structures et les<strong> ouvrages temporaires, ind\u00e9pendants de la structure du b\u00e2timent<\/strong>, r\u00e9alis\u00e9s pour garantir la s\u00e9curit\u00e9 des travailleurs sur le chantier et des personnes \u00e9trang\u00e8res au chantier en cas de leur implication accidentelle dans les temps et les espaces du chantier. Ils ne font pas partie de l&rsquo;ouvrage termin\u00e9 car ils seront retir\u00e9s plus tard.<\/p>\n<p>Aborder la s\u00e9curit\u00e9 sur les chantiers de construction n\u00e9cessite une compr\u00e9hension approfondie des ouvrages temporaires, tels que les \u00e9chafaudages, ainsi qu&rsquo;une connaissance d\u00e9taill\u00e9e de la r\u00e9glementation en vigueur.<\/p>\n<h2 id=\"ouvrages-temporaires-signification\">Ouvrages temporaires&nbsp;:&nbsp;signification<\/h2>\n<p>Les ouvrages temporaires englobent tous les am\u00e9nagements auxiliaires pour l&rsquo;ex\u00e9cution de travaux de construction (construction, assemblage, r\u00e9paration, maintenance, d\u00e9molition) caract\u00e9ris\u00e9s par leur non-continuit\u00e9, car ils sont destin\u00e9s \u00e0 \u00eatre retir\u00e9s d\u00e8s que la n\u00e9cessit\u00e9 pour laquelle ils ont \u00e9t\u00e9 r\u00e9alis\u00e9s cesse.<\/p>\n<p>Ils repr\u00e9sentent un deuxi\u00e8me ordre d&rsquo;ouvrages et d&rsquo;\u00e9quipements autour du b\u00e2timent en construction ou en r\u00e9novation, dont la pr\u00e9sence et l&rsquo;utilisation sont non seulement n\u00e9cessaires pour la r\u00e9alisation du projet, mais \u00e9galement pour garantir la s\u00e9curit\u00e9 des travailleurs.<\/p>\n<p>Il s&rsquo;agit donc d&rsquo;ouvrages d&rsquo;une importance fondamentale, \u00e0 consid\u00e9rer attentivement sous tous les aspects&nbsp;:&nbsp;<strong>conceptuel, constructif, conservateur<\/strong>. C&rsquo;est pourquoi leur inclusion dans les plans de s\u00e9curit\u00e9 est une question incontournable, car les ouvrages temporaires constituent l&rsquo;un des aspects les plus significatifs dans l&rsquo;\u00e9valuation des dispositifs de pr\u00e9vention des accidents \u00e0 pr\u00e9voir dans le plan lui-m\u00eame.<\/p>\n<h2 id=\"quels-sont-les-ouvrages-temporaires\">Quels sont les ouvrages temporaires<\/h2>\n<p>Les ouvrages temporaires se distinguent en fonction des objectifs auxquels ils sont destin\u00e9s en&nbsp;:&nbsp;<\/p>\n<ul>\n<li><strong>ouvrages de service<\/strong>&nbsp;:&nbsp;ils servent au stationnement et au transit s\u00fbr lors du travail de personnes, d&rsquo;objets, d&rsquo;outils, de mat\u00e9riaux et d&rsquo;appareils de levage ;<\/li>\n<li><strong>ouvrages de s\u00e9curit\u00e9<\/strong>&nbsp;:&nbsp;ils compl\u00e8tent la structure complexe de l&rsquo;ouvrage temporaire et sont indispensables pour emp\u00eacher les chutes de personnes et de mat\u00e9riaux pr\u00e9sents sur les ouvrages de service ;<\/li>\n<li><strong>ouvrages de soutien<\/strong>&nbsp;:&nbsp;ils garantissent la stabilit\u00e9 des parties de l&rsquo;ouvrage qui ne peuvent pas encore se soutenir seules.<\/li>\n<\/ul>\n<p>Il s&rsquo;agit d&rsquo;une distinction plus formelle que substantielle, car il est fr\u00e9quent que le m\u00eame am\u00e9nagement remplisse plusieurs fonctions simultan\u00e9ment (comme par exemple l&rsquo;\u00e9chafaudage).<\/p>\n<h2 id=\"ouvrages-temporaires-de-service\">Ouvrages temporaires de service<\/h2>\n<p>Les principaux ouvrages temporaires de service sont&nbsp;:&nbsp;<\/p>\n<ul>\n<li>\u00e9chafaudages ;<\/li>\n<li>passerelles ;<\/li>\n<li>plates-formes de zones de chargement et trappes.<\/li>\n<\/ul>\n<h3>\u00c9chafaudages<\/h3>\n<p>Parmi les ouvrages temporaires, le plus couramment utilis\u00e9 est l&rsquo;<strong>\u00e9chafaudage<\/strong> fixe en bois ou en m\u00e9tal, \u00e0 installer en fonction des besoins. Aujourd&rsquo;hui, l&rsquo;utilisation de l&rsquo;\u00e9chafaudage en bois est presque totalement abandonn\u00e9e. Il existe diff\u00e9rents <a href=\"https:\/\/biblus.accasoftware.com\/fr\/plan-dechafaudage-tout-sur-les-types-et-les-solutions-innovantes\/\" target=\"_blank\" rel=\"noopener\">types d&rsquo;\u00e9chafaudages<\/a> dont l&rsquo;utilisation est autoris\u00e9e par les normes&nbsp;:&nbsp;<\/p>\n<ul>\n<li>\u00e0 tubes et raccords ;<\/li>\n<li>\u00e0 cadre pr\u00e9fabriqu\u00e9 ;<\/li>\n<li>multidirectionnel.<\/li>\n<\/ul>\n<h3>Passerelles<\/h3>\n<p>Les passerelles servent \u00e0 relier des zones du chantier situ\u00e9es \u00e0 des hauteurs diff\u00e9rentes ou s\u00e9par\u00e9es par un vide.<\/p>\n<ul>\n<li>largeur \u2265 0,60 m lorsqu&rsquo;elles sont destin\u00e9es uniquement au passage des travailleurs ;<\/li>\n<li>si elles sont \u00e9galement utilis\u00e9es pour le transport de mat\u00e9riaux 1.20 m ;<\/li>\n<li>leur pente ne doit pas d\u00e9passer 50% ;<\/li>\n<li>des lattes transversales doivent \u00eatre fix\u00e9es sur les planches \u00e0 une distance ne d\u00e9passant pas la longueur d&rsquo;un homme charg\u00e9.<\/li>\n<\/ul>\n<h3>Plates-formes et trappes<\/h3>\n<p>Les ouvertures laiss\u00e9es dans les planchers ou les plates-formes de travail doivent \u00eatre entour\u00e9es d&rsquo;une balustrade normale et d&rsquo;une planche de pied fix\u00e9e solidement et d&rsquo;une r\u00e9sistance au moins \u00e9gale \u00e0 celle du plancher des ponts de service. Les ouvertures dans les murs donnant sur le vide ou les espaces ayant une profondeur sup\u00e9rieure \u00e0 0,50 m doivent \u00eatre pourvues d&rsquo;une balustrade normale et d&rsquo;une planche de pied ou \u00eatre convenablement bloqu\u00e9es pour emp\u00eacher la chute des personnes.<\/p>\n<h2 id=\"ouvrages-temporaires-de-securite\">Ouvrages temporaires de s\u00e9curit\u00e9<\/h2>\n<p>Les principaux ouvrages temporaires de s\u00e9curit\u00e9 sont&nbsp;:&nbsp;<\/p>\n<ul>\n<li>planchers au-dessus des postes de travail ;<\/li>\n<li>garde-corps de r\u00e9tention ;<\/li>\n<li>filets de protection contre les chutes.<\/li>\n<\/ul>\n<h3>Planchers au-dessus des postes de travail<\/h3>\n<p>Lorsque des b\u00e9tons et des mortiers sont m\u00e9lang\u00e9s ou d&rsquo;autres op\u00e9rations continues sont effectu\u00e9es \u00e0 proximit\u00e9 des \u00e9chafaudages ou des zones de chargement et de levage de mat\u00e9riaux, il est n\u00e9cessaire de construire un solide plancher surplombant \u00e0 une hauteur ne d\u00e9passant pas 3 m\u00e8tres du sol pour prot\u00e9ger contre la chute de mat\u00e9riaux (auvent).<\/p>\n<h3>Garde-corps de r\u00e9tention<\/h3>\n<p>La barri\u00e8re de r\u00e9tention se compose de planches fixes dispos\u00e9es en drapeaux inclin\u00e9s pour prot\u00e9ger les personnes en transit ou en arr\u00eat contre la chute d&rsquo;objets ou d&rsquo;\u00e9quipements minimes. Les exigences suivantes doivent \u00eatre respect\u00e9es&nbsp;:&nbsp;<\/p>\n<ul>\n<li>la distance maximale entre une barri\u00e8re de r\u00e9tention et n&rsquo;importe quel plancher ne doit pas d\u00e9passer 12 m ;<\/li>\n<li>la distance minimale entre le sommet de la barri\u00e8re de r\u00e9tention et le plancher doit \u00eatre de 1,10 m ;<\/li>\n<li>si elle est construite avec des planches, celles-ci doivent avoir une \u00e9paisseur minimale de 4 cm.<\/li>\n<\/ul>\n<h3>Filets de protection contre les chutes<\/h3>\n<p>Les filets de protection contre les chutes sont des <a href=\"https:\/\/biblus.accasoftware.com\/fr\/equipement-de-protection-collective\/\" target=\"_blank\" rel=\"noopener\">dispositifs de protection collective<\/a> contre les chutes de personnel affect\u00e9 aux travaux, \u00e9galement utilis\u00e9s pour contenir des objets et des d\u00e9bris.<\/p>\n<h2 id=\"ouvrages-temporaires-de-soutien\">Ouvrages temporaires de soutien<\/h2>\n<p>Les ouvrages de soutien correspondent \u00e0 une intervention de nature structurelle, car ils contrarient l&rsquo;action de basculement du sol. Il existe des ouvrages de soutien \u00e0 gravit\u00e9 (murs, gabions) et en b\u00e9ton arm\u00e9 (murs consoles, murs contreforts et \u00e9perons)&nbsp;;&nbsp;terre arm\u00e9e&nbsp;;&nbsp;parois (palplanches et \u00e9crans)&nbsp;;&nbsp;structures de sout\u00e8nement pour des excavations et des tranch\u00e9es.<\/p>\n<h2 id=\"ouvrages-temporaires-les-echafaudages\">Ouvrages temporaires&nbsp;:&nbsp;les \u00e9chafaudages<\/h2>\n<p>Des informations d\u00e9taill\u00e9es sont fournies sur les \u00e9l\u00e9ments constitutifs des <strong>\u00e9chafaudages<\/strong>, tels que les \u00e9l\u00e9ments situ\u00e9s \u00e0 la base des montants (socles) et les sous-ponts de s\u00e9curit\u00e9. L&rsquo;extr\u00e9mit\u00e9 inf\u00e9rieure du montant doit \u00eatre soutenue par une plaque de base de dimensions ad\u00e9quates, munie d&rsquo;\u00e9l\u00e9ments de r\u00e9partition de la charge transmise aux montants.<\/p>\n<p>D&rsquo;autres indications pour le socle sont&nbsp;:&nbsp;<\/p>\n<ul>\n<li><strong>dans le cas de d\u00e9parts sur des plans inclin\u00e9s, il y a le probl\u00e8me de l&rsquo;appui plat du socle<\/strong>&nbsp;;&nbsp;certains manuels d&rsquo;autorisation pr\u00e9voient, \u00e0 cet effet, un type de socle orientable ;<\/li>\n<li><strong>tous les manuels indiquent une planche de bois d&rsquo;une \u00e9paisseur d&rsquo;au moins 5 cm comme \u00e9l\u00e9ment de r\u00e9partition de la charge<\/strong>&nbsp;;&nbsp;par cons\u00e9quent, les sous socles en plastique jaune, n&rsquo;\u00e9tant pas autoris\u00e9s, ne seraient pas permis.<\/li>\n<\/ul>\n<h2 id=\"mise-a-la-terre-ancrages-et-garde-corps\">Mise \u00e0 la terre, ancrages et garde-corps<\/h2>\n<p>Une attention particuli\u00e8re est \u00e9galement accord\u00e9e au choix et \u00e0 la disposition des <strong>ancrages<\/strong>, des <strong>garde-corps<\/strong>, ainsi qu&rsquo;\u00e0 la <strong>mise \u00e0 la terre.<\/strong><\/p>\n<h3>Ancrages<\/h3>\n<p>Les ancrages doivent \u00eatre r\u00e9alis\u00e9s au moins tous les deux \u00e9tages d&rsquo;\u00e9chafaudage et tous les deux planchers. La r\u00e9sistance des ancrages varie en fonction du type d&rsquo;ancrage utilis\u00e9 et du type de support.<\/p>\n<h3>Garde-corps r\u00e9gulier<\/h3>\n<p>Les planchers et les ponts de service, les passerelles, les trottoirs situ\u00e9s \u00e0 plus de 2 m de hauteur doivent \u00eatre dot\u00e9s de robustes <a href=\"https:\/\/biblus.accasoftware.com\/fr\/les-caracteristiques-et-exigences-du-sommet-des-garde-corps-dechafaudage\/\" target=\"_blank\" rel=\"noopener\">garde-corps<\/a> sur tous les c\u00f4t\u00e9s vers le vide, constitu\u00e9s d&rsquo;une ou de plusieurs traverses parall\u00e8les au plancher, dont le bord sup\u00e9rieur est situ\u00e9 \u00e0 au moins 1 m du niveau du sol et d&rsquo;une planche de pied d&rsquo;au moins 20 cm de hauteur, align\u00e9e avec le plancher.<br \/>\nLes traverses et la planche de pied ne doivent laisser passer aucun espace vertical sup\u00e9rieur \u00e0 60 cm. Les traverses et la planche de pied doivent \u00eatre fix\u00e9es du c\u00f4t\u00e9 int\u00e9rieur des montants.<\/p>\n<h3>Mise \u00e0 la terre de l&rsquo;\u00e9chafaudage<\/h3>\n<p>La mise \u00e0 terre de l&rsquo;\u00e9chafaudage consiste \u00e0 canaliser les courants induits par la foudre directement dans le sol. Cette pratique vise \u00e0 \u00e9viter que la structure de l&rsquo;\u00e9chafaudage accumule une charge \u00e9lectrique dangereuse pouvant \u00eatre transf\u00e9r\u00e9e \u00e0 quiconque entre en contact avec elle.<\/p>\n<div class=\"international-product-banner-desktop\" style=\"text-align: center;\"><a class=\"product-banner-link\" href=\"https:\/\/www.accasoftware.com\/fr\/logiciel-plan-echafaudage\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" class=\"lazyload\" src=\"data:image\/gif;base64,R0lGODlhAQABAIAAAAAAAP\/\/\/yH5BAEAAAAALAAAAAABAAEAAAIBRAA7\" data-src=\"\/wp-content\/themes\/enfold-child\/img\/banner_prodotto\/certus-scaffolding-fr.jpg\" alt=\"certus-scaffolding\" \/><noscript><img decoding=\"async\" class=\"lazyload\" src=\"\/wp-content\/themes\/enfold-child\/img\/banner_prodotto\/certus-scaffolding-fr.jpg\" alt=\"certus-scaffolding\" \/><\/noscript><\/a><\/div>\n<div>\n<div class=\"international-product-banner-mobile\" style=\"text-align: center;\"><a class=\"product-banner-link\" href=\"https:\/\/www.accasoftware.com\/fr\/logiciel-plan-echafaudage\" target=\"_blank\" rel=\"noopener\"><img decoding=\"async\" class=\"lazyload\" src=\"data:image\/gif;base64,R0lGODlhAQABAIAAAAAAAP\/\/\/yH5BAEAAAAALAAAAAABAAEAAAIBRAA7\" data-src=\"\/wp-content\/themes\/enfold-child\/img\/banner_prodotto_mobile\/certus-scaffolding-fr.jpg\" alt=\"certus-scaffolding\" \/><noscript><img decoding=\"async\" class=\"lazyload\" src=\"\/wp-content\/themes\/enfold-child\/img\/banner_prodotto_mobile\/certus-scaffolding-fr.jpg\" alt=\"certus-scaffolding\" \/><\/noscript><\/a><\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Toutes les structures et les travaux temporaires ind\u00e9pendants du b\u00e2timent et ne faisant pas partie de l&rsquo;ouvrage termin\u00e9 sont consid\u00e9r\u00e9s comme des ouvrages temporaires<\/p>\n","protected":false},"author":54,"featured_media":24668,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_data_scadenza_evento":"","_evento_nome":"","_evento_data":"","_evento_luogo":"","_evento_cta":"","keyword_en":"","keyword_es":"","keyword_fr":"ouvrages temporaires","keyword_de":"","keyword_ptb":"","_note_content":"<table dir=\"ltr\" style=\"width: 100%; height: 285px;\" border=\"1\" cellspacing=\"0\" cellpadding=\"0\" data-sheets-root=\"1\"><colgroup><col width=\"42\" \/><col width=\"543\" \/><col width=\"93\" \/><\/colgroup>\r\n<tbody>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;EN&quot;}\">EN<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;temporary works in construction&quot;}\">temporary works in construction<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:20}\">20<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;EN&quot;}\">EN<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;what are temporary works in construction&quot;}\">what are temporary works in construction<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:20}\">20<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;EN&quot;}\">EN<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;what is temporary works in construction&quot;}\">what is temporary works in construction<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:20}\">20<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;EN&quot;}\">EN<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;construction temporary works&quot;}\">construction temporary works<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:10}\">10<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;EN&quot;}\">EN<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;list of temporary works in construction&quot;}\">list of temporary works in construction<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:10}\">10<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;EN&quot;}\">EN<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;temporary construction work&quot;}\">temporary construction work<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:10}\">10<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;EN&quot;}\">EN<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;temporary works construction definition&quot;}\">temporary works construction definition<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:10}\">10<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;FR&quot;}\">FR<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;ouvrages temporaires&quot;}\">ouvrages temporaires<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:0}\">0<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;PTB&quot;}\">PTB<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;estrutura tempor\u00e1ria&quot;}\">estrutura tempor\u00e1ria<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:20}\">20<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;ES&quot;}\">ES<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;instalaciones provisionales y temporales de obras&quot;}\">instalaciones provisionales y temporales de obras<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:20}\">20<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;ES&quot;}\">ES<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;instalaciones temporales&quot;}\">instalaciones temporales<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:20}\">20<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;ES&quot;}\">ES<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;instalaciones temporales de obra&quot;}\">instalaciones temporales de obra<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:20}\">20<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;DE&quot;}\">DE<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;tempor\u00e4re bauten&quot;}\">tempor\u00e4re bauten<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:20}\">20<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;DE&quot;}\">DE<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;tempor\u00e4re bauten definition&quot;}\">tempor\u00e4re bauten definition<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:20}\">20<\/td>\r\n<\/tr>\r\n<tr style=\"height: 19px;\">\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;DE&quot;}\">DE<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:2,&quot;2&quot;:&quot;detail tempor\u00e4re bauten&quot;}\">detail tempor\u00e4re bauten<\/td>\r\n<td style=\"height: 19px;\" data-sheets-value=\"{&quot;1&quot;:3,&quot;3&quot;:0}\">0<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>","footnotes":""},"categories":[108],"tags":[4875],"class_list":["post-24667","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-bim-et-conception-de-batiments","tag-newsletter-341"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v28.8 (Yoast SEO v28.8) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Ouvrages temporaires dans le domaine de la construction - BibLus<\/title>\n<meta name=\"description\" content=\"Les ouvrages provisoires sont toutes les structures et les travaux temporaires, ind\u00e9pendants du b\u00e2timent\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ouvrages temporaires dans le domaine de la construction\" \/>\n<meta property=\"og:description\" content=\"Les ouvrages provisoires sont toutes les structures et les travaux temporaires, ind\u00e9pendants du b\u00e2timent\" \/>\n<meta property=\"og:url\" content=\"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/\" \/>\n<meta property=\"og:site_name\" content=\"BibLus\" \/>\n<meta property=\"article:published_time\" content=\"2024-05-17T07:34:25+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-05-17T09:35:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2024\/05\/Provisional-works-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"843\" \/>\n\t<meta property=\"og:image:height\" content=\"321\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Editorial Team\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u00c9crit par\" \/>\n\t<meta name=\"twitter:data1\" content=\"Editorial Team\" \/>\n\t<meta name=\"twitter:label2\" content=\"Dur\u00e9e de lecture estim\u00e9e\" \/>\n\t<meta name=\"twitter:data2\" content=\"7 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/ouvrages-temporaires-dans-le-domaine-de-la-construction\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/ouvrages-temporaires-dans-le-domaine-de-la-construction\\\/\"},\"author\":{\"name\":\"Editorial Team\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/#\\\/schema\\\/person\\\/9b17de673ed181a3932fcc225c4d93b1\"},\"headline\":\"Ouvrages temporaires dans le domaine de la construction\",\"datePublished\":\"2024-05-17T07:34:25+00:00\",\"dateModified\":\"2024-05-17T09:35:32+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/ouvrages-temporaires-dans-le-domaine-de-la-construction\\\/\"},\"wordCount\":1380,\"image\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/ouvrages-temporaires-dans-le-domaine-de-la-construction\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2024\\\/05\\\/Provisional-works-1.jpg\",\"keywords\":[\"newsletter 341\"],\"articleSection\":[\"BIM et Conception de b\u00e2timents\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/ouvrages-temporaires-dans-le-domaine-de-la-construction\\\/\",\"url\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/ouvrages-temporaires-dans-le-domaine-de-la-construction\\\/\",\"name\":\"Ouvrages temporaires dans le domaine de la construction - BibLus\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/ouvrages-temporaires-dans-le-domaine-de-la-construction\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/ouvrages-temporaires-dans-le-domaine-de-la-construction\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2024\\\/05\\\/Provisional-works-1.jpg\",\"datePublished\":\"2024-05-17T07:34:25+00:00\",\"dateModified\":\"2024-05-17T09:35:32+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/#\\\/schema\\\/person\\\/9b17de673ed181a3932fcc225c4d93b1\"},\"description\":\"Les ouvrages provisoires sont toutes les structures et les travaux temporaires, ind\u00e9pendants du b\u00e2timent\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/ouvrages-temporaires-dans-le-domaine-de-la-construction\\\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/ouvrages-temporaires-dans-le-domaine-de-la-construction\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/ouvrages-temporaires-dans-le-domaine-de-la-construction\\\/#primaryimage\",\"url\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2024\\\/05\\\/Provisional-works-1.jpg\",\"contentUrl\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/wp-content\\\/uploads\\\/sites\\\/4\\\/2024\\\/05\\\/Provisional-works-1.jpg\",\"width\":843,\"height\":321},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/ouvrages-temporaires-dans-le-domaine-de-la-construction\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ouvrages temporaires dans le domaine de la construction\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/#website\",\"url\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/\",\"name\":\"BibLus\",\"description\":\"Blog du savoir faire et du logiciel pour l&#039;architecture, l&#039;ing\u00e9nierie et la construction\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/biblus.accasoftware.com\\\/fr\\\/#\\\/schema\\\/person\\\/9b17de673ed181a3932fcc225c4d93b1\",\"name\":\"Editorial Team\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Ouvrages temporaires dans le domaine de la construction - BibLus","description":"Les ouvrages provisoires sont toutes les structures et les travaux temporaires, ind\u00e9pendants du b\u00e2timent","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/","og_locale":"fr_FR","og_type":"article","og_title":"Ouvrages temporaires dans le domaine de la construction","og_description":"Les ouvrages provisoires sont toutes les structures et les travaux temporaires, ind\u00e9pendants du b\u00e2timent","og_url":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/","og_site_name":"BibLus","article_published_time":"2024-05-17T07:34:25+00:00","article_modified_time":"2024-05-17T09:35:32+00:00","og_image":[{"width":843,"height":321,"url":"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2024\/05\/Provisional-works-1.jpg","type":"image\/jpeg"}],"author":"Editorial Team","twitter_card":"summary_large_image","twitter_misc":{"\u00c9crit par":"Editorial Team","Dur\u00e9e de lecture estim\u00e9e":"7 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/#article","isPartOf":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/"},"author":{"name":"Editorial Team","@id":"https:\/\/biblus.accasoftware.com\/fr\/#\/schema\/person\/9b17de673ed181a3932fcc225c4d93b1"},"headline":"Ouvrages temporaires dans le domaine de la construction","datePublished":"2024-05-17T07:34:25+00:00","dateModified":"2024-05-17T09:35:32+00:00","mainEntityOfPage":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/"},"wordCount":1380,"image":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2024\/05\/Provisional-works-1.jpg","keywords":["newsletter 341"],"articleSection":["BIM et Conception de b\u00e2timents"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/","url":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/","name":"Ouvrages temporaires dans le domaine de la construction - BibLus","isPartOf":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/#primaryimage"},"image":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/#primaryimage"},"thumbnailUrl":"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2024\/05\/Provisional-works-1.jpg","datePublished":"2024-05-17T07:34:25+00:00","dateModified":"2024-05-17T09:35:32+00:00","author":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/#\/schema\/person\/9b17de673ed181a3932fcc225c4d93b1"},"description":"Les ouvrages provisoires sont toutes les structures et les travaux temporaires, ind\u00e9pendants du b\u00e2timent","breadcrumb":{"@id":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/"]}]},{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/#primaryimage","url":"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2024\/05\/Provisional-works-1.jpg","contentUrl":"https:\/\/biblus.accasoftware.com\/fr\/wp-content\/uploads\/sites\/4\/2024\/05\/Provisional-works-1.jpg","width":843,"height":321},{"@type":"BreadcrumbList","@id":"https:\/\/biblus.accasoftware.com\/fr\/ouvrages-temporaires-dans-le-domaine-de-la-construction\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/biblus.accasoftware.com\/fr\/"},{"@type":"ListItem","position":2,"name":"Ouvrages temporaires dans le domaine de la construction"}]},{"@type":"WebSite","@id":"https:\/\/biblus.accasoftware.com\/fr\/#website","url":"https:\/\/biblus.accasoftware.com\/fr\/","name":"BibLus","description":"Blog du savoir faire et du logiciel pour l&#039;architecture, l&#039;ing\u00e9nierie et la construction","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/biblus.accasoftware.com\/fr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Person","@id":"https:\/\/biblus.accasoftware.com\/fr\/#\/schema\/person\/9b17de673ed181a3932fcc225c4d93b1","name":"Editorial Team"}]}},"_links":{"self":[{"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/posts\/24667","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/users\/54"}],"replies":[{"embeddable":true,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/comments?post=24667"}],"version-history":[{"count":5,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/posts\/24667\/revisions"}],"predecessor-version":[{"id":24669,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/posts\/24667\/revisions\/24669"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/media\/24668"}],"wp:attachment":[{"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/media?parent=24667"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/categories?post=24667"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/biblus.accasoftware.com\/fr\/wp-json\/wp\/v2\/tags?post=24667"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}